Bathroom rebuilt from exposed surfaces to final fit-off
This bathroom was stripped back to the wall and floor surfaces, prepared around the shower and floor wastes, waterproofed, tiled and fitted out as a finished room.
- Starting condition
- The bathroom is shown after the old finishes were removed, with the shower base, wall junctions and floor wastes exposed for the wet-area rebuild.
- Work stage
- Strip-out → substrate and drainage preparation → membrane → wall tiling → final fit-off
Work completed
- Existing wall and floor finishes removed
- Shower base, wall surfaces and drainage points prepared
- Waterproof membrane applied across the wet area
- Wall tiling, shower screen and bathroom fittings completed
Finished bathroom
The finished bathroom includes the shower, vanity, toilet, tiled walls and floor drainage in one usable room.
Existing finishes removed
Bathroom base prepared
Waterproof membrane applied
Wall tiling underway
Shower area completed
Bathroom fit-off completed